
Elgin - Site progress
Progress is well underway on the main floors at Elgin, with internal works transforming the space. We’re opening up key areas, carefully removing partitions to create a more fluid, interconnected layout. This phase includes establishing connections between the split levels, enhancing both the functionality and aesthetic flow throughout the property. These structural changes are set to bring a renewed sense of space and continuity, setting the stage for the next steps in the project’s evolution. Keep an eye out for updates as we shape a more dynamic and cohesive interior.
310studio
Brightbow Workspace
60 - 62 Bedminster Parade
Bristol BS3 4HL
info@310studio.co.uk
+44 0117 223 0078

© 2025 - 310studio